Europen Steel Structure Accessories EN 39 S235 / S275 Scaffold Pipe

Short Description:

EN39 Scaffold Pipe is a durable carbon steel tube that is ideal for scaffolding and other temporary structures. It provides dependable strength and excellent weldability and it meets the requirements of the European safety standards.


  • Standard: EN 39
  • Grade: EN 39 S235 / S275
  • Dimensions: Common Outside Diameters: 48.3 mm (1.9 inch, most common scaffolding specification) Wall Thickness: 2.0 mm – 4.0 mm (customizable to project) Standard Lengths: 3.0 m / 4.0 m / 6.0 m Custom lengths available
  • Type: Seamless or Welded Steel Tube
  • Mechanical Properties: Yield Strength: ≥ 235 MPa Tensile Strength: 360–510 MPa
  • Applications: Temporary scaffolding and work platforms ,Shoring and structural supports in construction,Industrial platforms and maintenance access
  • Quality Certification: ISO 9001
  • Payment Terms: T/T 30% Advance + 70% Balance
  • Delivery Time: 7–15 days
  • Product Detail

    Product Tags

    Product Detail

    Parameter Specification / Details
    Product Name EN 39 Scaffold Pipe / Structural Steel Tube
    Material Mild Carbon Steel S235 / S275
    Standards EN 39 European Standard
    Dimensions Outer Diameter: 21.3–88.9 mm; Wall Thickness: 2.0–4.5 mm; Length: 6 m, 12 m, or customized
    Type Seamless or ERW (Electric Resistance Welded) Tube
    Surface Treatment Black steel, Hot-Dip Galvanized (HDG), Painted or Epoxy coating optional
    Mechanical Properties Yield Strength: ≥235–275 MPa; Tensile Strength: 360–510 MPa; Elongation ≥20%
    Applications Construction scaffolding, industrial platforms, shoring systems, building framework support, temporary structures
    Quality Certification ISO 9001, EN 39 compliance
    Payment Terms T/T 30% Advance + 70% Balance
    Delivery Time 7–15 days (depending on quantity and customization)
    savab (4)
    savab (5)

    EN 39 S235/S275 Scaffold Pipe Size

    Outer Diameter (mm / in) Wall Thickness (mm / in) Length (m / ft) Weight per Meter (kg/m) Approx. Load Capacity (kg) Notes
    48 mm / 1.89 in 2.6 mm / 0.102 in 6 m / 20 ft 4.7 kg/m 550–650 EN 39 S235, welded
    48 mm / 1.89 in 3.2 mm / 0.126 in 12 m / 40 ft 5.8 kg/m 650–780 HDG coating optional
    50 mm / 1.97 in 2.8 mm / 0.110 in 6 m / 20 ft 5.1 kg/m 650–720 Structural grade, welded/ERW
    50 mm / 1.97 in 3.6 mm / 0.142 in 12 m / 40 ft 6.8 kg/m 780–880 Suitable for heavy platforms
    60 mm / 2.36 in 3.2 mm / 0.126 in 6 m / 20 ft 6.4 kg/m 820–920 Recommended for vertical posts
    60 mm / 2.36 in 4.5 mm / 0.177 in 12 m / 40 ft 9.2 kg/m 1,000–1,200 Heavy-duty load-bearing use

    EN 39 S235/S275 Scaffold Pipe Customized Content

    Customization Category Available Options Description / Notes
    Dimensions OD, Wall Thickness, Length OD: 48–60 mm; Wall Thickness: 2.5–4.5 mm; Length: 6–12 m customizable
    Processing Cutting, Threading, Bending Pipes can be cut, bent, or prefabricated to suit site requirements
    Surface Finish Black, HDG, Epoxy, Painted Finish chosen based on corrosion resistance or environment
    Marking & Packing Tags, Project Codes, Transport-Ready Labels include size, grade, and specification; bundled for container or truck shipping

    Surface Finish

    carbon steel scoffold pipe
    galvanized scaffold-tube-72
    painted scoffold pipe

    Carbon steel surface

    Galvanized surface

    Painted surface

    Application

    1. Construction Support
      Temporary platforms and supports for buildings, bridges, and industrial sites.

    2. Access & Maintenance
      Durable walkways and maintenance platforms for warehouses and factories.

    3. Temporary Load-Bearing
      Props or shoring for formwork and other temporary structures.

    4. Event & Stage Platforms
      Temporary stages and platforms for concerts or outdoor events.

    5. Home Renovation
      Scaffolds for DIY, renovation, and repair projects indoors or outdoors.

    savab (7)

    Our Advantages

    High Strength
    Serviceable very high strength steel plate fabricated into very lightweight vacuum chambers.
    Made from ASTM carbon steel, strong and heavy duty.

    Corrosion Resistant
    Hot-dip galvanized, painted, or powdercoat finished.

    Available in Sizes to Your Specifications
    Many diameters, wall thicknesses, and lengths are available to meet the needs of your project.

    Easy Installation
    Seamless or welded pipes enable rapid installation in site.

    Reliable Quality
    Manufactured to ASTM and ISO9001 standards.

    Low Maintenance
    Lubricious, durable coatings reduce maintenance and replacement.

    Flexible Use
    The flexible system can be used for scaffolds, work platforms, temporary structures or even stages for events and home projects.

    Packaging & Shipping

    PACKING

    Protection: Scaffold tubes are wrapped in water resistant tarpaulins to protect against wet environment, scrapes and rust; extra cushioning could be inserted.

    Binding: The bundles are firmly bound with steel or plastic straps for tightness.

    Marking/Labeling: This label contains your material grade, size, batch number and inspection/test report to ensure easy traceability.

    DELIVERY

    Rail Transport: Multiple bundles are safely loaded to maximize space for long distance shipment.

    Road Transport: Bundles piled on trucks or trailers with edge protectors and teeth of anti-slip behavior.

    Sea Freight: Pipes in 20ft or 40ft containers tied down to prevent motion.Tubes in 20ft or 40ft containers secured to avoid move

    scaffolding tube (6)

    FAQ

    Q1: What are the scaffold pipes made of?
    A: It is fabricated from carbon steel with thickness of the walls and the strength sufficiently comply with the standard of industry.

    Q2: What surface finishes are available?
    A: Yes can be hot dip galvanized or other type of anti corrusie coatings.

    Q3: What sizes are available?
    A: Standard size tubes and walls are stocked, special size can be manufactured.

    Q4: How are pipes packaged for shipment?
    A: Bundled, wrapped in water resistant tarpaulin, packed with cushion if needed and strapped, label on size, grade, batch and inspection.

    Q5: How long is the delivery time?
    A: Generally 10 to 15 days after deposit, but it also depends on quantity and specs.


  • Previous:
  • Next:

  • Write your message here and send it to us